A production hall with machines running under overhead lighting

Manufacturing operations,
unified.

One system for the shop floor.
Operations, quality, assets, safety and people.

Trusted by

Sound familiar?

Most plants run on paper, spreadsheets and memory.

It works, until the auditor arrives, the machine stops, or the shift ends with nobody able to say what happened.

Without Phasis

  • Overall Equipment Effectiveness (OEE) arrives Friday, in a spreadsheet.
  • The defect was found. What was done about it, nobody can say.
  • The same machine stops every week, and every repair starts from scratch.
  • The near miss went in a notebook. The notebook went in a drawer.
  • Nobody can say who is signed off for the machine on nights.
  • Handover is shouted across the line at shift change.

With Phasis

  • OEE is on the wall before the shift ends.
  • The defect, the cause and the fix sit in one file. It does not close until the defect has stayed away.
  • Every stop and every repair lands on the machine's record.
  • The near miss is reported, assigned and closed before the next shift.
  • The matrix says who is signed off for nights, before anyone starts.
  • The next shift reads what the last one left.

Getting started

How we work together.

You are running on one line before you decide anything bigger.

01

A conversation

An open conversation, about half an hour, on your lines, your shifts, and what goes wrong most weeks. No slides.

02

A pilot on one line

One module, one line, real shifts, a few weeks. You see it working on your own plant before you commit to the rest.

03

Go live

The module goes into daily use. We stay close and fix what the floor tells us, on days you pick.

04

Grow at your pace

The next module when it starts to hurt. It reads the plant you already set up, so nothing is set up twice.

We also build the edge.

When a machine has no signal to give, we build the sensor, the gateway or the controller that gives it one, and the platform reads it.

An open automation rack with DIN rail controller modules and dense wiring

Questions

Questions plants ask first

Do we have to replace our ERP?

No. Phasis runs the floor and your ERP keeps the books. Work orders, materials and finished quantities pass between the two through Integrations & API, so nobody types the same thing into both systems.

How long until the first module is live?

A pilot on one line, in weeks rather than quarters. We set the plant up with your people, put one module into real shifts, and fix what the floor tells us. Nothing else is switched on until that one is earning its place.

Where does our data live?

On a European cloud host set aside for you, or on a server at your own site. It is never shared with another customer. You choose, and you can move later.

What if we only need maintenance?

Then you turn on one module. A module that is off is absent: no menu entry, no half-filled screens. Add calibration or spare parts later and they read the same plant you already set up.

Do operators need training?

The screens are built for the person standing at the line: a few fields, big targets, plain words. A shift learns the daily job in a shift. Supervisors and engineers take longer, and we walk them through it.

See it on your own plant.

An open conversation with us, about half an hour. We walk the modules you care about against your own lines and shifts.