A pressure gauge, valve and sensor mounted on plant pipework

Assets & Energy

Calibration

Keep overdue and failed instruments out of quality decisions.

Every quality decision depends on reliable measurements. Phasis brings due and overdue instruments to the team's attention, quarantines failed gauges until QA releases them and prevents the person who performed a calibration from approving it.

The calibration record contains the reference and measured values, while Phasis calculates the error and pass-or-fail result. QA can approve, return or reject the submitted record. Approval locks the result, generates the certificate and sets the next due date.

In-Process & SPC blocks measurements from an out-of-calibration instrument. Validation can export a controlled instrument-mapping report without rebuilding the list manually.

A pressure gauge, valve and sensor mounted on plant pipework

Who uses it

  1. Metrology Manager

    Owns the register and the catalogs, and plans the work.

  2. Metrologist

    Performs the calibration and enters the readings.

  3. QA Approver

    Approves, returns or rejects the record.

  4. Engineering Viewer

    Reads the register and the mapping report.

How the process changes

  • TodayCalibration due dates depend on someone reviewing a spreadsheet.
    With PhasisDue and overdue instruments are flagged automatically.
  • TodayCalibration errors are calculated in an editable spreadsheet.
    With PhasisPhasis calculates the error and pass-or-fail result consistently.
  • TodayA failed gauge can remain available for use.
    With PhasisThe instrument is quarantined until QA releases it.
  • TodayQualification teams rebuild instrument lists manually.
    With PhasisThe required instruments are filtered and exported as a controlled PDF.
  • TodayReplacing an instrument breaks the connection to its history.
    With PhasisThe tag retains the history while the serial number changes.

What you get

  • Automatic visibility of due and overdue calibration work.
  • Quarantine of failed instruments until an authorized QA release.
  • Independent approval that prevents technicians from approving their own work.
  • Continuous instrument history when a physical gauge is replaced.

See how Phasis fits your operation.

Tell us which process you want to improve. We will show the relevant workflow using the lines, shifts and decisions your team handles every day.