Assets & Energy

Tools & Fixtures

Track molds and dies that wear out by count, not by date.

This is production tooling: molds, dies, punches, change parts and jigs. A tool is not a machine. It is needed to make one product at one step. It dies by count rather than by calendar, because a mold has a life of 500,000 shots and not five years. Its parts can be replaced one at a time, and it travels between a press, the crib and the toolmaker.

The tool room registers a tool from its type, and life, service interval and cavity count prefill. A setter mounts it on a machine and records the real setup minutes, then the teardown minutes on dismount. Production output feeds a usage ledger, so remaining life is a live number rather than a wall chart. A tool past its service count flags itself. One broken cavity of sixteen is blocked instead of taking the whole tool out of the run, and the counter is snapshotted so later usage counts against the corrected number. A tool issued from the crib to a named worker cannot be mounted until it is back.

Scheduling shows a readiness banner on the work order, so the planner learns the mold is at the vendor before releasing the job. The check is advice. It does not lock the plan by itself.

A technician working inside an open electrical panel.

Who uses it

PersonWhat they do here
SetterMounts and dismounts tools, and blocks a damaged cavity.
Tool Room LeadOwns the register, plans service and manages vendor trips and the crib.
Production PlannerChecks the tool is ready before releasing a work order.
Maintenance PlannerRaises repair jobs against the tool's linked asset.
QualityAttributes a defect to one cavity.

Today vs Phasis

Today
With Phasis
Tool life is a wall chart or the setter's head
Production output feeds a usage ledger, and remaining life is a live number
Service is scheduled by date, so a worn tool fails mid run
A tool past its service count flags itself
One broken cavity takes the whole tool out
The cavity is blocked, and later usage counts on the corrected number
A work order is released, then someone finds the tool is at the vendor
The readiness check says so before release
Setup minutes are an assumption in the recipe
Mount and dismount record the real minutes

What you get

  • Maintenance schedules by date and tooling dies by count, which is why this is its own module.
  • Remaining life comes from production counts, not from a clipboard.
  • One damaged cavity is blocked and the rest of the tool keeps running.
  • The planner sees the tool is out at the vendor before the work order is released.
  • Mount and dismount record the real setup and teardown minutes.
  • A tool out on issue to a named worker cannot be mounted.

See it on your own plant.

Thirty minutes with an engineer. We walk the modules you care about against your own lines and shifts.

We use cookies

We use cookies to improve your experience, analyze site traffic with Google Analytics, and enable our contact form. For more details on how we use cookies and handle your data, please see our cookie policy.
Learn more.