The factory day, planned and recorded.
This is the factory day. Plan the work, staff the lines, run them, and record what actually happened. Capacity says what next month can hold. Scheduling puts the work orders on a timeline. Shifts sets the window a line is staffed. Production records the counts, the stops and the scrap, and turns them into OEE from the same numbers.
Modules in this area
Production & OEE
Record what the line made, stopped, and scrapped. Turn that into OEE.
Scheduling
Put work orders on a timeline. Drag them onto lines. Release the plan.
Capacity Planning
See which lines will be overloaded next month, before you promise the volume.
Shifts & Labor
Plan which line runs which shift. Record what really happened.
Not built yet
These are on the map and honestly labelled. A module in design has a full specification behind it. A planned module is a name and a conversation, nothing more.
Traceability
Which lot went into which lot. Answer a recall with a list.
Inventory
Where production stock sits, and how much.
See it on your own plant.
Thirty minutes with an engineer. We walk the modules you care about against your own lines and shifts.