Platform

One plant model. Every module reads it.

You describe the plant once: site, area, line, section, unit. Production, quality, maintenance, safety and people all hang off that description, and every record names who did what and when.

Why it holds together

Three things that are true of every module

Two people must agree.

One person records the work. A second person approves it, and the system refuses self-approval even when one user holds both roles. Quality, Calibration, HSE, Permit to Work and Documents all follow that rule, because it sits in the platform rather than in five separate features.

The plant is entered once.

Master Data holds the hierarchy: site, area, line, section, unit. Maintenance, Calibration, HSE, Permit to Work, Quality, Shifts, Production and Utilities read that one description. There is no second equipment list to keep in step.

OEE from what actually happened.

Production records the counts, the stops and the scrap. Shifts supplies the window the line was staffed, and the server computes Overall Equipment Effectiveness (OEE) from those two. When it cannot be computed the score is blank, never a fake zero.

How it fits together

One plant model, five areas, and the joins between them

Master Data holds the plant. Every area reads it. The value shows up where two areas meet, because the check happens on its own without anyone remembering to make it.

Master Data

One plant model: site, area, line, section, unit. Every module reads it.

  • Operations

    Production, Scheduling, Capacity Planning

  • Assets & Energy

    Maintenance, Spare Parts, Calibration

  • Quality & Compliance

    Quality, In-Process & SPC, Validation

  • Safety

    HSE, Permit to Work

  • People & Improvement

    Skills & Training, Shift Handover

Master Data → Maintenance

Add a line to the plant model and its asset record appears in Maintenance as a draft. Nobody describes the same machine twice.

Production → Tools & Fixtures

Output counts tool life. A mold comes off the machine on shot count, not on a date somebody wrote in a spreadsheet.

Calibration → In-Process & SPC

A reading taken with a gauge that is out of calibration is refused at entry. The control chart only holds measurements you can defend.

Skills & Training → Permit to Work

The permit checks that the worker holds the competency the job needs, and that the certificate behind it has not expired.

Foundation

One plant model under every module.

These are not license lines. They apply to every module. You describe the plant once and Maintenance, Calibration, HSE, Permit to Work, Quality, Shifts, Production and Utilities all read the same description. The same login, the same permission check, the same audit trail and the same signature rule run underneath all of them.

Read what the foundation covers

Status

What is finished today

Built and running

Every live module shares one plant model, one login, one permission check and one audit trail. Electronic signature is a switch you turn on per action, on the approvals that matter to you. You buy modules one at a time, and a module that is off is absent from the system until the day you turn it on.

Not built yet

Traceability has a full specification and no build behind it. We can show you the design. Inventory, Batch Records and Kaizen are names in the menu and nothing more, which is why they carry a label everywhere they appear on this site. Operator tablet apps are not built either.

The system runs on hardware set aside for your plant, at your site or on a European cloud host, and an update reaches it when you choose to install it. Ask us what a module does today and you get the built answer, not the roadmap answer.

See it on your own plant.

Thirty minutes with an engineer. We walk the modules you care about against your own lines and shifts.

We use cookies

We use cookies to improve your experience, analyze site traffic with Google Analytics, and enable our contact form. For more details on how we use cookies and handle your data, please see our cookie policy.
Learn more.